Dear participants,
We hope you enjoyed your time at ESTEC and learned a lot during the Fly Your Satellite! 3 Selection Workshop.
We kindly ask you to fill in this feedback questionnaire so that we can keep improving our future events. Please note that the questionnaire is completely anonymous, therefore do not hesitate to provide constructive written feedback on this Workshop!
Thank you for taking the time to answer these questions!
ESA Education Office
mandatory answer
Question 1
Question 2
Question 3
The Workshop met my expectations 0 |
uncheck
| |||||
What I learnt during the Workshop will be useful for the development of our project 0 |
uncheck
| |||||
The schedule was well planned 0 |
uncheck
| |||||
The duration of the lectures were good 0 |
uncheck
| |||||
The practical/logistic information provided before and during the event was sufficient and clear 0 |
uncheck
| |||||
The hotel was comfortable and had all the basic facilities I needed 0 |
uncheck
| |||||
The lunches and coffee breaks at ESTEC were good 0 |
uncheck
| |||||
The social dinner at La Galleria was good 0 |
uncheck
|
Comments
Question 4
Introduction to Fly Your Satellite! 0 |
uncheck
| |||||
Participating in FYS2 from the student perspective 0 |
uncheck
| |||||
Erasmus Highbay Tour 0 |
uncheck
| |||||
Assembly, Integration, Verification 0 |
uncheck
| |||||
Product Assurance and How to increase CubeSat’s reliability 0 |
uncheck
| |||||
HERA: ESA’s Asteroid Mission 0 |
uncheck
| |||||
EPS Design and Verification 0 |
uncheck
| |||||
OBDH Design and Verification 0 |
uncheck
| |||||
Software Development 0 |
uncheck
| |||||
Structural Design and Verification 0 |
uncheck
| |||||
Thermal Design and Verification 0 |
uncheck
| |||||
AOCS Design and Verification 0 |
uncheck
| |||||
Materials and Processes 0 |
uncheck
| |||||
TT'&C and Ground Segment 0 |
uncheck
| |||||
Spacecraft Operations 0 |
uncheck
| |||||
Testing in FYS: Functional and Environmental Tests 0 |
uncheck
| |||||
Radiation effects and considerations for CubeSats 0 |
uncheck
| |||||
Requirements Engineering Workshop 0 |
uncheck
| |||||
ESA Space Debris Mitigation Requirements and Small Sats 0 |
uncheck
| |||||
Fly Your Satellite! - Preparing for the next phase 0 |
uncheck
|
Comments
Question 5
Question 6
Question 7
Question 8